Power transformers
Core cutting & stacking · winding · vapor-phase drying · tanking
Agents: protect winders and dry-out cycles, the two biggest schedule risks.
Ship more transformers, switchgear, UPS and cooling units from the lines you already have. Predict winder and test-bay failures, catch leak and insulation drift before FAT, and keep the backlog moving. Agents run on your PLCs, test-stand data, MES and CMMS, and your crew approves every action.
The pressure on every line
The AI build-out needs power, cooling and racks faster than factories can add lines, people or test capacity.
Average lead time for a U.S. power transformer. Switchgear averages 44 weeks.1
U.S. power transformer supply shortfall in 2025, with demand up 119% since 2019.2
Planned 2026 hyperscaler AI infrastructure spend.3
Vertiv’s year-end 2025 backlog, up 109% year over year.4
Share of U.S. electricity data centers could use by 2028, up from 4.4% in 2023.5
U.S. manufacturing jobs that could go unfilled by 2033, out of 3.8M needed.6
From coil shop to factory acceptance test
Here's what MicroAI agents watch in a transformer, switchgear or cooling plant, and the KPI each station is judged on.
Agents read the sensor, process and maintenance data your plant already records. No cameras or rip-and-replace hardware required.
Built for the whole power and cooling chain
Core cutting & stacking · winding · vapor-phase drying · tanking
Agents: protect winders and dry-out cycles, the two biggest schedule risks.
Coil winding · core assembly · VPI · routine test
Agents: hold first-pass yield as volumes climb.
Sheet metal · busbar fab · breaker assembly · hipot test
Agents: find the station gating output and keep test bays moving.
SMT & power electronics · assembly · burn-in
Agents: tie burn-in failures to component lots before they ship.
Busbar cutting & plating · insulation · assembly
Agents: watch plating chemistry and insulation process drift.
CDU assembly · cold-plate brazing · helium leak test
Agents: catch braze-zone drift before leak rates cross the limit.
Coil brazing · fan assembly · run test
Agents: trend leak and run-test results by line and shift.
Laser & punch · press brake · welding · powder coat
Agents: keep cure ovens and weld cells in their windows.
Your AI workforce
Each agent has one job, explains its reasoning and hands decisions to the right person. Nothing changes on your line without crew approval.
Learns normal behavior for winders, ovens, presses and test stands and warns weeks before a failure.
Vibration · motor current · tension · vacuumShows which station or test bay is gating shipments right now, and why.
MES · test-stand logs · WIPDrafts the work order with parts and steps and sends it to your CMMS for approval.
CMMS / EAM write-backRuns SPC on the steps that decide test results, from winding to brazing.
Tension · braze temps · resin viscosityConnects FAT, hipot, PD and leak-test failures to their station, lot and shift.
Test results · genealogy · supplier lotsCompares every oven and dry-out cycle with the golden curve and flags waste.
kWh per unit · cycle hours · peak kWTurns test notes and repair history into guided steps for new hires.
Test notes · SOPs · FAT logsRe-plans the build when a component lot or test slot slips.
ERP · MES schedules · supplier ASNsFlags devices and traffic on the plant network that do not belong.
PLCs · test stands · HMIsWinder 3 tension variance is up 22% on HV coils. Dancer arm bearing wear likely. Swap booked for Saturday.
✓ Approved by coil shop leadFAT Bay 2 is gating 38% of UPS shipments. Retests doubled on one IGBT lot. Lot placed on hold.
✓ Approved by plant managerIllustrative examples
Before and after
| Area | Today | With MicroAI agents |
|---|---|---|
| Test bays | Units queue for FAT and nobody knows which failures repeat. | Agents show what gates shipments and which lots drive retests. |
| Winding & insulation | Coil and dry-out problems surface at final test. | Tension and vacuum drift flagged at the station, weeks earlier. |
| Leak escapes | Leak rates creep up until a part fails in the field. | Leak-rate trends tied back to braze-furnace zones. |
| Energy | Long oven cycles are accepted as normal. | Every cycle compared with the golden curve, with waste ranked. |
| Hiring | New testers take months to learn the floor. | Test notes and fixes turned into guided steps on day one. |
| Planning | A late component lot reshuffles the whole week. | Builds re-sequenced in minutes, with ship dates checked. |
How it works
Hook into your PLCs, test stands, MES and CMMS. Agents read what you already collect.
Agents learn each asset's normal behavior and your plant's operating patterns.
Agents raise explained alerts, draft work orders and plan fixes. Your team approves.
Track first-pass yield, retest rate, units shipped and energy per unit against your baseline.
Why now
Dell’Oro forecasts manufacturer revenue for data center physical infrastructure will reach $120B by 2030, a 22% CAGR, with liquid cooling the fastest-growing segment.
Dell’Oro Group, Aug 20267Eaton says it is opening a 370,000 sq ft medium-voltage switchgear plant in Nebraska to meet AI data center demand, with production in 2027.
Eaton press release, Apr 20268Manufacturers have announced $1.8B of North American transformer capacity since 2023, while supply still falls short by about 30%.
Wood Mackenzie via pv magazine, Aug 20259FAQ
Demand from data centers, grid upgrades and electrification has grown much faster than factory capacity, skilled labor and key materials such as electrical steel.
Wood Mackenzie puts the average U.S. power transformer lead time at 128 weeks and switchgear at 44 weeks, as reported in 2026.
By finding the station or test bay that gates shipments, preventing the failures that cause the longest stops, and cutting retests. Agents work on all three with data you already have.
Agents watch winding tension, dry-out and VPI cycles and connect them to turns-ratio, PD and hipot results, so drift is fixed before units reach final test.
Common causes include winding and insulation defects, component lots, wiring errors and test-stand drift. Agents separate real part problems from tester problems and trace each to its source.
Agents learn normal tension, dancer arm and drive current behavior for each coil type and warn when wear starts to show, before it damages a coil.
By tying helium leak-test trends to braze-furnace zones, recipes and lots, so a drifting zone is recalibrated before leakers ship.
Agents capture what experienced testers and technicians know as guided steps, and take on monitoring work so people can focus on building and testing.